Construction Update: Finishing the Foundation

The perimeter foundation is shaping up!  The next steps are finishing the foundation work and then installing the underground mechanicals.  Once that’s done, the first floor concrete can be poured.

Construction update: foundation

This aerial shot allow you to see the entire size of the building.  The only perimeter foundation remaining is in the bottom left corner of the picture in what will be the public meeting room of the new building.  The two groups of workers are finishing up the elevator foundations and working on the electrical conduit that has to be installed under the concrete slab.

Keep an eye out for steel going up soon!

Construction update: aerial